SWG celebrates two year anniversary of first installation at the Tennessee Valley Authority

On October 22nd, 2012, the Tennessee Valley Authority (TVA) completed the installation of 100 PowerLine Guardian devices. This installation represents the first deployment of Smart Wire Grid’s innovative power flow control solution and a significant step for TVA in a path to the grid of the future. TVA’s fleet of PowerLine Guardians has been operating reliably for the past two years. To read more about the installation at TVA, click here to download our recent report on the performance of these units.

822 replies

Comments are closed.