INCREASE POWER TRANSFER CAPACITY

  • The two SmartValve deployments initially unlock 80 MW of latent network capacity.
  • The solution can easily be expanded to release up to 180 MW.
  • The solutions help meet regional renewable goals by optimally leveraging the existing hydro generation and creating capacity for additional renewables.

DOWNLOAD INFORMATION SHEET