Litgrid: Palanga – Vėjas project

Litgrid is using SUMO Dynamic Line Rating software to increase transmission capacity, improve grid visibility, and support the integration of more wind energy on Lithuania’s existing grid.

View project overview
Litgrid Palanga Vėjas project
25% Capacity increase
36 Towers on the line
DLR Dynamic Line Rating

Increasing transmission capacity on Lithuania’s coastline

Litgrid, the transmission system operator of Lithuania, needed a smarter way to support wind energy integration while making better use of existing transmission infrastructure.

Litgrid was looking for a solution to support the seamless integration of wind energy across its grid. This required a more resilient power grid where capacity on the existing network could be better utilized alongside new power lines planned for construction.

To fully utilize existing capacity, Litgrid deployed SUMO on the Palanga – Vėjas overhead line, which includes 36 towers and is located in the windy north-west part of the Lithuanian coastline.

SUMO provides system-wide visibility of conductors, transformers, and other network components using both mezzo-scale and micro-scale weather data.

With SUMO, Litgrid can increase grid capacity without adding new infrastructure, supporting the integration of more renewable energy while improving visibility into real-time network capability.

Dynamic Line Rating in action

SUMO uses weather data and real-time network conditions to identify when existing lines can safely carry more power.

Better visibility across assets

The software supports visibility across conductors, transformers, and other critical network components.

More usable capacity without new infrastructure

The Palanga – Vėjas project shows how Dynamic Line Rating can help transmission operators increase usable grid capacity while supporting resilience, safety, and long-term asset planning.

Increased transmission capacity

Helps Litgrid make better use of the existing Palanga – Vėjas overhead line.

Improved grid resilience and safety

Provides more accurate operating visibility based on real-time environmental conditions.

Low-cost implementation

Increases usable capacity without requiring additional transmission infrastructure.

Optimized asset lifetimes

Supports asset utilization and planning decisions with more accurate ratings.

Enhancing transmission capacity with SUMO: Litgrid, Lithuania