Smart Wires – Get more capacity from the grid you already have

Get more capacity from the grid you already have

We deliver firm, controllable capacity from existing infrastructure so utilities can solve urgent reliability and grid capacity challenges today — and plan with confidence for tomorrow — in months, not years.

SmartValve illustration
5+ GW
Firm, controllable capacity delivered globally
40+
Transmission circuits worldwide
15+
Countries across four continents
12–18 mo
Typical deployment timeline

Grids are being asked to do more than they were built for

Load is growing. Connection queues are long. Outage windows are shrinking. New transmission takes years to permit and build. The bottleneck is not generation or demand — it is the transmission system itself.

Smart Wires gives grid operators direct, real-time control over how power flows across their network. That makes existing circuits more productive, reduces congestion costs, and creates a faster path to connect new load and generation while longer-lead upgrades are planned and built.

Firm capacity, not paper capacity Capacity grid operators can count on under normal and N-1 contingency conditions — not theoretical headroom.
Speed that changes projects Deploy in months where new lines and phase-shifting transformers take years. Connect load and generation faster.
Flexibility to adapt Modular, voltage-agnostic, and relocatable. Reduce stranded asset risk as the grid evolves. Expand or redeploy as needs change.
Reliability, non-negotiable Utility-grade reliability as standard. Smart Wires delivers speed and flexibility without trading off security of supply.
Global SmartValve deployments map

We deliver firm, controllable capacity on existing transmission. Our deployments across four continents help operators manage congestion, strengthen reliability, and serve load growth faster.

5+ GW of firm, controllable capacity delivered globally
Controllable power flow to manage congestion and reduce re-dispatch costs
Faster path to connect new load and generation
Improved reliability under normal and contingency conditions
Lower total system cost versus build-only alternatives

Common challenges, one deployable solution

These are some of the most common challenges operators bring to us. If yours looks different, we can still help.

01 — Congestion relief

Reduce re-dispatch costs and relieve overloaded circuits

Power cannot flow where it is needed, driving curtailment costs and limiting firm transfer capacity. SmartValve shifts power off overloaded circuits to reduce constraint costs and increase usable transfer capability — no new infrastructure required.

02 — Interconnection and load growth

Connect new load and generation faster

Data centers, manufacturing, and new generation face multi-year queues on grids that cannot accommodate them quickly enough. SmartValve increases available capacity on existing circuits, creating firm headroom years ahead of when new transmission would be built.

03 — Grid reliability and operational security

Maintain security of supply under contingency conditions

Thermal, voltage, and stability constraints reduce operating margins during peak and high-stress periods. SmartValve redirects power flows around out-of-service assets and extends outage windows without increasing reliability risk.

04 — Asset support and maintenance

Protect critical assets from accelerated wear and failure

Ageing phase-shifting transformers and other mechanical controls were not designed for the volume and variability of modern power flows, making failure an expensive operational risk. SmartValve operates in series with existing equipment to absorb flow control duties, reduce mechanical stress, and maintain line availability if the primary asset goes offline.

05 — Constrained environments

Deploy where conventional solutions cannot

Geography, permitting, and site limitations rule out conventional solutions in many locations. SmartValve is modular and can be configured for available substation space and deployed in layouts that match site-specific constraints.

Three advantages

Speed. Flexibility. Firm capacity.

Deploy in months, not years. Modular and relocatable as the grid evolves. More than 5 GW of firm, controllable capacity already delivered globally — with reliability as the non-negotiable baseline.

Learn about SmartValve

Case studies

Real deployments. Confirmed outcomes. Named operators.

Latest news

Expert insights

Smart Wires team

Careers

We are a team of over 100 passionate and ambitious experts spread across four continents who work every day to transform grids globally. Interested in joining us on this mission? Take a look at our open positions.

Search jobs

Ready to get more from your grid?

Talk to our experts to see how SmartValve has been deployed on networks like yours.

Contact us